Selling the equipment
If you have surplus switchgear in Maine, start with the equipment you can identify and the location where it is held. We are a buyer, not a seller: we review available details and can make a cash offer for a defined lot. We buy equipment across all voltage classes, pay the agreed amount upfront before pickup, and cover all freight for the purchased equipment. Offers depend on the specific equipment, condition, scope and other transaction details; an inquiry does not guarantee a purchase or a particular price.
For equipment we purchase, we handle and cover the entire removal and logistics process: our qualified crews isolate and disconnect it, and we arrange crane work when needed, rigging, loading, hauling and all freight. You do not have to disconnect, test, rig, load or haul the equipment. We coordinate the work with the authorized site contact and follow the site's applicable safety and access procedures.
Identify the switchgear
Describe the complete lineup, its manufacturer, model or family where legible, number of vertical sections, main and feeder devices, and whether breakers are drawout or fixed. A one-line drawing, if already available, helps distinguish a main-tie-main arrangement from a single-ended lineup without requiring anyone to operate it.
What the 800-amp rating describes
For 800-amp equipment, state exactly where the 800-amp marking appears: on the main bus, a main breaker, a breaker frame or another component. At this rating, a seller may be describing a main device, an assembly bus or an individual feeder; those are not interchangeable descriptions. Record the voltage, manufacturer, catalog identification and any documented interrupting rating separately. Do not add branch-breaker ratings to infer a main rating or change device settings to check it. If a label is inaccessible, use existing records or leave the figure unconfirmed.
Condition and completeness
Note missing doors, breakers, covers, interlocks or control-power components, and describe corrosion, water exposure or visible damage. An intact exterior does not prove internal condition, so distinguish what you know from what cannot be seen safely. Include spare breakers and documentation only if they belong to the offered lot.
Access and collection planning
A switchgear lineup may consist of several heavy shipping sections rather than one cabinet. Give overall dimensions, the number of sections and any available weights, along with door openings, floor level and the distance to a suitable staging area. The separation and lifting method must be decided by qualified parties for the actual equipment.
Identify the building, equipment room, floor level and the practical route to a truck-accessible staging area. For occupied or shared premises, establish who controls the loading area, who can authorize release and whether an appointment is required. Explain any gate, weather, surface or security limitations that are known at the proposed collection date.
We handle removal and transport
A purchased lot can involve more than freight: equipment must be safely isolated, disconnected, rigged, loaded and hauled from its actual location. We arrange and cover those activities, including crane work when needed and all freight. Our qualified crews coordinate the work with the authorized site contact and follow applicable site procedures; you do not need to disconnect, rig, load or haul the equipment yourself. Describe any stairs, tight turns, floor limits, overhead obstructions and available staging so the crew can plan. Never improvise a lift or move energized gear. The method depends on the equipment and site, and collection timing is arranged after the details are known.
Use ratings exactly as recorded
Equipment labels can include several numbers that sound similar but answer different questions: the nominal system voltage, rated voltage, main bus current, breaker frame or trip rating, and interrupting capability. A catalog number is not automatically a rating. Copy the units and surrounding label text, and identify whether the number belongs to the complete assembly or one device. Existing documents may fill gaps but should be marked as records rather than treated as a fresh inspection. If a plate is missing or unreadable, say so. No seller is asked to energize, test or expose live equipment to resolve an uncertain value.
Account for other work at the site
A surplus sale can happen alongside construction, decommissioning or continued operations. Let the buyer know if another contractor controls the work area, if routes may be blocked, or if a building remains occupied. Explain whether the equipment is staged independently or must wait for a separate release decision. A useful plan includes a site contact, a workable access window and an agreed location for the carrier; it does not assume that every project task is complete. Any necessary separation from live systems is a task for qualified personnel, and the seller is not asked to operate or test electrical equipment for a quote.
Electrical safety comes first
Protecting people and active systems comes first. Only appropriately qualified personnel should isolate electrical equipment and determine when it is safe to access, disconnect and release under the site's procedures. A lineup may have more than one source or stored energy, so do not assume a shutdown label or an open door establishes safety. Do not open energized equipment or manipulate protective devices for our review. We do not ask the seller to test or energize anything; send information already available from a safe location instead.
Cash offer, upfront payment and full-service removal
To request a cash offer for switchgear, share the location, the quantity, the information available from existing records or safely accessible labels, and any known damage or missing parts. Include photographs only when they can be taken safely and are permitted by the site. Tell us when the equipment may be released and whether the lot includes related devices or documentation. If something is unknown, say so; no seller-performed electrical testing is needed.
We review the details and discuss an offer when the equipment and transaction are a fit. If an offer is agreed, we pay the agreed amount upfront before pickup. We arrange and cover qualified isolation and disconnects, crane work when needed, rigging, loading, hauling and all freight for the purchased equipment. The seller does not have to perform or arrange this work. Our crews coordinate access and the safe removal plan with the authorized site contact. There is no promise of a particular offer, acceptance or collection date.