Selling the equipment
If you have surplus switchgear in Maine, start with the equipment you can identify and the location where it is held. We are a buyer, not a seller: we review available details and can make a cash offer for a defined lot. We buy equipment across all voltage classes, pay the agreed amount upfront before pickup, and cover all freight for the purchased equipment. Offers depend on the specific equipment, condition, scope and other transaction details; an inquiry does not guarantee a purchase or a particular price.
For equipment we purchase, we handle and cover the entire removal and logistics process: our qualified crews isolate and disconnect it, and we arrange crane work when needed, rigging, loading, hauling and all freight. You do not have to disconnect, test, rig, load or haul the equipment. We coordinate the work with the authorized site contact and follow the site's applicable safety and access procedures.
Identify the switchgear
Describe the complete lineup, its manufacturer, model or family where legible, number of vertical sections, main and feeder devices, and whether breakers are drawout or fixed. A one-line drawing, if already available, helps distinguish a main-tie-main arrangement from a single-ended lineup without requiring anyone to operate it.
What the 2,000-amp rating describes
For 2,000-amp equipment, state exactly where the 2,000-amp marking appears: on the main bus, a main breaker, a breaker frame or another component. At this rating, an assembly may contain several sections and devices with different individual ratings, so a section count and complete device inventory can materially clarify the lot. Record the voltage, manufacturer, catalog identification and any documented interrupting rating separately. Do not add branch-breaker ratings to infer a main rating or change device settings to check it. If a label is inaccessible, use existing records or leave the figure unconfirmed.
Condition and completeness
Note missing doors, breakers, covers, interlocks or control-power components, and describe corrosion, water exposure or visible damage. An intact exterior does not prove internal condition, so distinguish what you know from what cannot be seen safely. Include spare breakers and documentation only if they belong to the offered lot.
Access and collection planning
A switchgear lineup may consist of several heavy shipping sections rather than one cabinet. Give overall dimensions, the number of sections and any available weights, along with door openings, floor level and the distance to a suitable staging area. The separation and lifting method must be decided by qualified parties for the actual equipment.
Identify the building, equipment room, floor level and the practical route to a truck-accessible staging area. For occupied or shared premises, establish who controls the loading area, who can authorize release and whether an appointment is required. Explain any gate, weather, surface or security limitations that are known at the proposed collection date.
Keep spare parts tied to the right assembly
Spare breakers, removable units, relays, covers and manuals may be stored away from their original assembly. When they are included in a proposed sale, list each group separately and say which equipment it is believed to match. Preserve any existing part numbers or tags, but do not assert compatibility merely because two pieces look alike or carry a similar brand. Missing spares are not a reason to delay an initial inquiry. Conversely, if site personnel intend to keep certain spares for equipment still in service, state that clearly so those items are not accidentally counted in the offer or freight plan.
Make the lot boundaries explicit
A complete sale description identifies both what is included and what stays behind. For example, a lineup could be offered with its installed devices but without spare parts reserved for another facility, or a group of loose breakers could be offered independently of the cabinets in which they were once used. List related accessories, manuals and spare units separately, and avoid assuming a component belongs to the lot just because it is nearby. If several owners or departments control different items, sort out their approval before accepting an offer. This prevents a pricing discussion from turning on equipment the seller cannot actually release.
Explain storage and exposure honestly
The useful history of surplus equipment is not limited to its age. Tell the buyer whether it has been stored indoors, outdoors, under cover or in an unconditioned building, and mention any known water, smoke, corrosion or physical damage. If a flood, process material or other environmental concern is known, describe it and share existing records when appropriate. A clean exterior does not establish the condition of internal parts, and an old date does not settle whether the equipment is usable. If you do not know the storage history, say so. There is no need to clean, open or operate equipment to make it appear more complete.
Electrical safety comes first
A closed facility or idle machine does not by itself prove an electrical assembly is safe to handle. Our qualified crews coordinate with the authorized site team to isolate all applicable sources and establish a safe condition before disconnecting or moving equipment. Never operate a switch, remove a cover or expose live parts for a photograph or quote. Seller testing is not required, including operational, insulation or transfer testing. Existing nameplates and project records are useful where safely available, and an unknown rating can simply be listed as unknown.
Cash offer, upfront payment and full-service removal
To request a cash offer for switchgear, share the location, the quantity, the information available from existing records or safely accessible labels, and any known damage or missing parts. Include photographs only when they can be taken safely and are permitted by the site. Tell us when the equipment may be released and whether the lot includes related devices or documentation. If something is unknown, say so; no seller-performed electrical testing is needed.
We review the details and discuss an offer when the equipment and transaction are a fit. If an offer is agreed, we pay the agreed amount upfront before pickup. We arrange and cover qualified isolation and disconnects, crane work when needed, rigging, loading, hauling and all freight for the purchased equipment. The seller does not have to perform or arrange this work. Our crews coordinate access and the safe removal plan with the authorized site contact. There is no promise of a particular offer, acceptance or collection date.