Selling the equipment
If you have 100-amp motor control centers in Maine, tell us whether the rating belongs to the complete assembly or to a particular device. We buy, rather than sell, used electrical equipment across all voltage classes and review the actual lot for a cash offer. If a sale is agreed, payment is upfront before pickup and we cover all freight for purchased equipment. Seller testing is not required, and neither an offer nor a collection date is guaranteed.
For equipment we purchase, we handle and cover the entire removal and logistics process: our qualified crews isolate and disconnect it, and we arrange crane work when needed, rigging, loading, hauling and all freight. You do not have to disconnect, test, rig, load or haul the equipment. We coordinate the work with the authorized site contact and follow the site's applicable safety and access procedures.
Identify the motor control centers
For a motor control center, describe the number of vertical sections and, if known, the number and types of installed buckets or units. Include the main bus rating, voltage, manufacturer and control-voltage information shown in existing records. Bucket identification and completeness can be as important as the outer cabinet.
Where the 100-amp rating appears
For 100-amp equipment, state exactly where the 100-amp marking appears: on the main bus, a main breaker, a breaker frame or another component. At this rating, a breaker or a smaller distribution assembly may be offered on its own or in a group; identify each separately. Record the voltage, manufacturer, catalog identification and any documented interrupting rating separately. Do not add branch-breaker ratings to infer a main rating or change device settings to check it. If a label is inaccessible, use existing records or leave the figure unconfirmed. In a lot of motor control centers, provide the separate ratings of the assembly and individual devices where known; an incomplete label is not a reason to test the equipment.
Condition and completeness
List empty positions, missing buckets, damaged doors, removed controls and known water or process exposure. If spare buckets, drives or documentation are included, say so separately. Do not insert, withdraw or operate units to create an inventory; use existing records or exterior photographs where safe.
Access and collection planning
MCC sections and removable units need a coherent inventory when they are separated for transport. Tell us whether the lineup is intact, whether loose buckets are already boxed, and where each group is stored. Provide exterior dimensions and the route to the loading area, leaving any dismantling to qualified personnel.
Identify the building, equipment room, floor level and the practical route to a truck-accessible staging area. For occupied or shared premises, establish who controls the loading area, who can authorize release and whether an appointment is required. Explain any gate, weather, surface or security limitations that are known at the proposed collection date.
Photograph only what can be seen safely
Useful photographs can include the overall exterior, an accessible nameplate, any visible damage and the surrounding route to the loading area. Take them only from a safe, permitted position and follow the site's rules for photography. Never open an energized enclosure, remove a barrier, manipulate a device or approach exposed electrical parts to obtain a better image. If a label is not safely accessible, provide an existing record or mark the detail unknown. Several focused images are generally more informative than a distant picture of a whole room, but photographs are a starting point, not a request for electrical inspection or testing by the seller.
Describe a realistic release date
A demolition date, a planned shutdown and the date an asset becomes available for collection are different milestones. Tell the buyer whether the equipment is already out of service, remains connected, or is subject to a future project decision. If another contractor controls building access or removal, identify that dependency. Propose an availability window rather than promising a date the site cannot yet authorize. The buyer can discuss the lot while plans are developing, but our qualified crews coordinate safe isolation with the authorized site personnel, who confirm final release. No particular offer, pickup date or project outcome should be assumed.
Make the lot boundaries explicit
A complete sale description identifies both what is included and what stays behind. For example, a lineup could be offered with its installed devices but without spare parts reserved for another facility, or a group of loose breakers could be offered independently of the cabinets in which they were once used. List related accessories, manuals and spare units separately, and avoid assuming a component belongs to the lot just because it is nearby. If several owners or departments control different items, sort out their approval before accepting an offer. This prevents a pricing discussion from turning on equipment the seller cannot actually release.
Electrical safety comes first
Electrical equipment can retain dangerous energy or remain connected to more than one source even when a project is described as shut down. Qualified personnel must isolate the equipment and establish its safe condition under the site's procedures before access, disconnection or removal. Do not open energized enclosures, remove barriers, rack breakers or touch exposed conductors to gather information. We do not ask sellers to energize or test equipment. Use existing records and photographs taken only where safely accessible; if a detail cannot be obtained safely, tell us it is unknown.
Cash offer, upfront payment and full-service removal
To request a cash offer for motor control centers, share the location, the quantity, the information available from existing records or safely accessible labels, and any known damage or missing parts. Include photographs only when they can be taken safely and are permitted by the site. Tell us when the equipment may be released and whether the lot includes related devices or documentation. If something is unknown, say so; no seller-performed electrical testing is needed.
We review the details and discuss an offer when the equipment and transaction are a fit. If an offer is agreed, we pay the agreed amount upfront before pickup. We arrange and cover qualified isolation and disconnects, crane work when needed, rigging, loading, hauling and all freight for the purchased equipment. The seller does not have to perform or arrange this work. Our crews coordinate access and the safe removal plan with the authorized site contact. There is no promise of a particular offer, acceptance or collection date.