Selling the equipment
Have surplus medium-voltage switchgear in Maine? We buy used electrical equipment rather than selling it, and we can review a single item or a clearly defined larger lot. A useful starting point is the manufacturer, ratings, quantity and known condition, not proof that the equipment operates. We buy across all voltage classes, make cash offers when a lot is a fit, pay the agreed amount upfront before pickup, and cover all freight for the purchased equipment. Price, acceptance and timing depend on the equipment and transaction; none is guaranteed.
For equipment we purchase, we handle and cover the entire removal and logistics process: our qualified crews isolate and disconnect it, and we arrange crane work when needed, rigging, loading, hauling and all freight. You do not have to disconnect, test, rig, load or haul the equipment. We coordinate the work with the authorized site contact and follow the site's applicable safety and access procedures.
Identify the medium-voltage switchgear
Share the rated voltage, current, manufacturer, number of sections and types of breakers or switches, as recorded on accessible labels or drawings. A nominal system voltage and an equipment voltage class are not always the same number; provide both when they are already documented.
Condition and completeness
Describe the known state of the enclosure, drawout devices, relays, control components and any missing parts. Note water exposure, stored condition and available maintenance history without asserting that the equipment is operational. Do not open compartments or operate equipment for the purpose of preparing a listing.
Access and collection planning
Medium-voltage sections and breakers can be heavy and may require controlled separation and lifting. Describe the lineup dimensions, room level, route to the outside and any existing section weights. Our appropriately qualified crews coordinate isolation and release with the authorized site team; the removal plan depends on the equipment and site.
Identify the building, equipment room, floor level and the practical route to a truck-accessible staging area. For occupied or shared premises, establish who controls the loading area, who can authorize release and whether an appointment is required. Explain any gate, weather, surface or security limitations that are known at the proposed collection date.
Document visible condition without overpromising
It is reasonable to say that a cabinet is visibly complete or that certain breakers are present, but an exterior view cannot prove that internal parts function or that all ratings match. Describe known damage, alterations, missing doors, stored condition and available service records, and distinguish a firsthand observation from an inherited description. If a piece has never been used by the present owner, explain that the history is unknown rather than calling it tested or operational. Honest uncertainty gives the buyer a useful basis for follow-up and helps avoid misleading assumptions. There is no requirement for seller-performed testing.
We handle removal and transport
A purchased lot can involve more than freight: equipment must be safely isolated, disconnected, rigged, loaded and hauled from its actual location. We arrange and cover those activities, including crane work when needed and all freight. Our qualified crews coordinate the work with the authorized site contact and follow applicable site procedures; you do not need to disconnect, rig, load or haul the equipment yourself. Describe any stairs, tight turns, floor limits, overhead obstructions and available staging so the crew can plan. Never improvise a lift or move energized gear. The method depends on the equipment and site, and collection timing is arranged after the details are known.
Identify the owner and the release contact
The person operating a building is not always the owner of its electrical equipment. A landlord, tenant, contractor, lender or other party may have an interest in some or all of the assets. Confirm who is authorized to sell the specific equipment and who will be available to release it to the carrier. If a demolition contractor is involved, clarify whether the contractor is merely removing the equipment or also owns it. For multiple sites, provide an appropriate contact at each location. Clear authority and accurate lot boundaries make the transaction simpler without requiring a seller to disclose unrelated confidential project information.
Electrical safety comes first
A closed facility or idle machine does not by itself prove an electrical assembly is safe to handle. Our qualified crews coordinate with the authorized site team to isolate all applicable sources and establish a safe condition before disconnecting or moving equipment. Never operate a switch, remove a cover or expose live parts for a photograph or quote. Seller testing is not required, including operational, insulation or transfer testing. Existing nameplates and project records are useful where safely available, and an unknown rating can simply be listed as unknown.
Cash offer, upfront payment and full-service removal
To request a cash offer for medium-voltage switchgear, share the location, the quantity, the information available from existing records or safely accessible labels, and any known damage or missing parts. Include photographs only when they can be taken safely and are permitted by the site. Tell us when the equipment may be released and whether the lot includes related devices or documentation. If something is unknown, say so; no seller-performed electrical testing is needed.
We review the details and discuss an offer when the equipment and transaction are a fit. If an offer is agreed, we pay the agreed amount upfront before pickup. We arrange and cover qualified isolation and disconnects, crane work when needed, rigging, loading, hauling and all freight for the purchased equipment. The seller does not have to perform or arrange this work. Our crews coordinate access and the safe removal plan with the authorized site contact. There is no promise of a particular offer, acceptance or collection date.