Selling the equipment
If you have 100-amp circuit breakers in Maine, tell us whether the rating belongs to the complete assembly or to a particular device. We buy, rather than sell, used electrical equipment across all voltage classes and review the actual lot for a cash offer. If a sale is agreed, payment is upfront before pickup and we cover all freight for purchased equipment. Seller testing is not required, and neither an offer nor a collection date is guaranteed.
For equipment we purchase, we handle and cover the entire removal and logistics process: our qualified crews isolate and disconnect it, and we arrange crane work when needed, rigging, loading, hauling and all freight. You do not have to disconnect, test, rig, load or haul the equipment. We coordinate the work with the authorized site contact and follow the site's applicable safety and access procedures.
Identify the circuit breakers
List each breaker's manufacturer and catalog or model number as marked, voltage rating, frame rating, trip rating or settings when documented, pole count and quantity. Frame size, trip rating and interrupting rating describe different things; do not substitute one for another when a label is incomplete.
Where the 100-amp rating appears
For 100-amp equipment, state exactly where the 100-amp marking appears: on the main bus, a main breaker, a breaker frame or another component. At this rating, a breaker or a smaller distribution assembly may be offered on its own or in a group; identify each separately. Record the voltage, manufacturer, catalog identification and any documented interrupting rating separately. Do not add branch-breaker ratings to infer a main rating or change device settings to check it. If a label is inaccessible, use existing records or leave the figure unconfirmed. In a lot of circuit breakers, provide the separate ratings of the assembly and individual devices where known; an incomplete label is not a reason to test the equipment.
Condition and completeness
Distinguish loose breakers from devices still installed in a lineup, and note whether accessories, terminals or drawout components are present. Report visible damage, missing parts and storage exposure. A breaker need not be operated, opened or tested by the seller to request an offer.
Access and collection planning
Loose breakers need an item count and an idea of individual size and weight; a breaker installed in a lineup needs a description of the larger assembly and access route. Tell us what packaging is already available and whether other equipment is included in the same proposed shipment.
Identify the building, equipment room, floor level and the practical route to a truck-accessible staging area. For occupied or shared premises, establish who controls the loading area, who can authorize release and whether an appointment is required. Explain any gate, weather, surface or security limitations that are known at the proposed collection date.
Account for other work at the site
A surplus sale can happen alongside construction, decommissioning or continued operations. Let the buyer know if another contractor controls the work area, if routes may be blocked, or if a building remains occupied. Explain whether the equipment is staged independently or must wait for a separate release decision. A useful plan includes a site contact, a workable access window and an agreed location for the carrier; it does not assume that every project task is complete. Any necessary separation from live systems is a task for qualified personnel, and the seller is not asked to operate or test electrical equipment for a quote.
Plan for a mixed or incomplete lot
Surplus is often a mixture: a complete assembly in one room, spare devices on a shelf and an incomplete section in storage. List the quantities and condition of each group rather than assigning the condition of the best item to the whole lot. Explain which parts are missing and whether existing records are available. An incomplete description can be updated as additional safe information becomes available, and an item does not need to be made operational to request a cash offer. The buyer evaluates the specific equipment and commercial details; interest or an offer is not guaranteed for every lot.
Organize a multi-building collection
When surplus equipment is spread across a property, give each building or storage area its own inventory and access description. A street address may cover more than one gate, dock or electrical room. Tell the buyer which items are on different floors, which are already at a staging location and whether separate people must authorize release. If assets are at entirely different sites, list those sites separately instead of assuming one truck can collect everything in a single stop. This information helps define the purchased lot and freight arrangements without committing either party to a pickup schedule before access is confirmed.
Electrical safety comes first
Electrical equipment can retain dangerous energy or remain connected to more than one source even when a project is described as shut down. Qualified personnel must isolate the equipment and establish its safe condition under the site's procedures before access, disconnection or removal. Do not open energized enclosures, remove barriers, rack breakers or touch exposed conductors to gather information. We do not ask sellers to energize or test equipment. Use existing records and photographs taken only where safely accessible; if a detail cannot be obtained safely, tell us it is unknown.
Cash offer, upfront payment and full-service removal
To request a cash offer for circuit breakers, share the location, the quantity, the information available from existing records or safely accessible labels, and any known damage or missing parts. Include photographs only when they can be taken safely and are permitted by the site. Tell us when the equipment may be released and whether the lot includes related devices or documentation. If something is unknown, say so; no seller-performed electrical testing is needed.
We review the details and discuss an offer when the equipment and transaction are a fit. If an offer is agreed, we pay the agreed amount upfront before pickup. We arrange and cover qualified isolation and disconnects, crane work when needed, rigging, loading, hauling and all freight for the purchased equipment. The seller does not have to perform or arrange this work. Our crews coordinate access and the safe removal plan with the authorized site contact. There is no promise of a particular offer, acceptance or collection date.