Selling the equipment
If you have surplus switchgear in Maine, start with the equipment you can identify and the location where it is held. We are a buyer, not a seller: we review available details and can make a cash offer for a defined lot. We buy equipment across all voltage classes, pay the agreed amount upfront before pickup, and cover all freight for the purchased equipment. Offers depend on the specific equipment, condition, scope and other transaction details; an inquiry does not guarantee a purchase or a particular price.
For equipment we purchase, we handle and cover the entire removal and logistics process: our qualified crews isolate and disconnect it, and we arrange crane work when needed, rigging, loading, hauling and all freight. You do not have to disconnect, test, rig, load or haul the equipment. We coordinate the work with the authorized site contact and follow the site's applicable safety and access procedures.
Identify the switchgear
Describe the complete lineup, its manufacturer, model or family where legible, number of vertical sections, main and feeder devices, and whether breakers are drawout or fixed. A one-line drawing, if already available, helps distinguish a main-tie-main arrangement from a single-ended lineup without requiring anyone to operate it.
What a buyer needs to review
A used-equipment buyer evaluates the actual lot rather than treating every electrical cabinet as equivalent. The manufacturer, voltage, main and device ratings, section count, completeness, known condition and location help define what is being offered. An owner can start with incomplete existing records and disclose what is unknown. For multiple pieces, a list distinguishing installed equipment, loose breakers and excluded spares makes the proposed sale easier to evaluate. An inquiry does not commit the owner to sell or guarantee that a buyer will make an offer.
Condition and completeness
Note missing doors, breakers, covers, interlocks or control-power components, and describe corrosion, water exposure or visible damage. An intact exterior does not prove internal condition, so distinguish what you know from what cannot be seen safely. Include spare breakers and documentation only if they belong to the offered lot.
Access and collection planning
A switchgear lineup may consist of several heavy shipping sections rather than one cabinet. Give overall dimensions, the number of sections and any available weights, along with door openings, floor level and the distance to a suitable staging area. The separation and lifting method must be decided by qualified parties for the actual equipment.
Identify the building, equipment room, floor level and the practical route to a truck-accessible staging area. For occupied or shared premises, establish who controls the loading area, who can authorize release and whether an appointment is required. Explain any gate, weather, surface or security limitations that are known at the proposed collection date.
Identify the owner and the release contact
The person operating a building is not always the owner of its electrical equipment. A landlord, tenant, contractor, lender or other party may have an interest in some or all of the assets. Confirm who is authorized to sell the specific equipment and who will be available to release it to the carrier. If a demolition contractor is involved, clarify whether the contractor is merely removing the equipment or also owns it. For multiple sites, provide an appropriate contact at each location. Clear authority and accurate lot boundaries make the transaction simpler without requiring a seller to disclose unrelated confidential project information.
Describe a realistic release date
A demolition date, a planned shutdown and the date an asset becomes available for collection are different milestones. Tell the buyer whether the equipment is already out of service, remains connected, or is subject to a future project decision. If another contractor controls building access or removal, identify that dependency. Propose an availability window rather than promising a date the site cannot yet authorize. The buyer can discuss the lot while plans are developing, but our qualified crews coordinate safe isolation with the authorized site personnel, who confirm final release. No particular offer, pickup date or project outcome should be assumed.
Build an inventory that can be checked
Give each item or lineup section a simple number, then list its manufacturer, description, accessible model or catalog number, voltage, current and quantity. For a mixed lot, say which loose components are included and where they are stored. A spreadsheet, equipment schedule or clear written list is sufficient; exact weights and perfect records are not a condition for starting the discussion. Mark uncertain details as unknown instead of estimating ratings. If several labels contradict the project paperwork, send both sources and identify which one belongs to the physical equipment. A clear inventory makes it easier to distinguish the offered assets from items that must remain on site.
Electrical safety comes first
Before any electrical gear is disconnected, moved or closely accessed, qualified personnel must isolate it and establish its safe condition using the site's applicable procedures. Equipment adjacent to the lot can remain energized, and a building closure is not proof of isolation. Do not remove covers, expose conductors, operate switches or withdraw breakers to collect details. We do not require the seller to perform testing. If the nameplate or condition cannot be viewed safely, use existing documentation or identify that information as unavailable.
Cash offer, upfront payment and full-service removal
To request a cash offer for switchgear, share the location, the quantity, the information available from existing records or safely accessible labels, and any known damage or missing parts. Include photographs only when they can be taken safely and are permitted by the site. Tell us when the equipment may be released and whether the lot includes related devices or documentation. If something is unknown, say so; no seller-performed electrical testing is needed.
We review the details and discuss an offer when the equipment and transaction are a fit. If an offer is agreed, we pay the agreed amount upfront before pickup. We arrange and cover qualified isolation and disconnects, crane work when needed, rigging, loading, hauling and all freight for the purchased equipment. The seller does not have to perform or arrange this work. Our crews coordinate access and the safe removal plan with the authorized site contact. There is no promise of a particular offer, acceptance or collection date.