Selling the equipment
Owners with surplus unit substations from utility substations in Maine can request a review of the specific equipment released for sale. We buy used equipment across all voltage classes rather than selling it, make cash offers where appropriate, pay the agreed amount upfront before pickup and cover all freight for purchased equipment. No seller testing is required. An offer, price or collection schedule depends on the equipment and transaction.
For equipment we purchase, we handle and cover the entire removal and logistics process: our qualified crews isolate and disconnect it, and we arrange crane work when needed, rigging, loading, hauling and all freight. You do not have to disconnect, test, rig, load or haul the equipment. We coordinate the work with the authorized site contact and follow the site's applicable safety and access procedures.
Identify the unit substations
A unit substation can combine primary switching, a transformer section and secondary distribution. Identify which sections are included, the manufacturer and nameplate ratings of each component, and whether the assembly is complete. State transformer kVA and primary and secondary voltages only when shown in existing records.
Unit Substations from utility substations
For equipment associated with a utility substation, ownership and authorization are essential: identify the party that can sell the specific gear and the contact responsible for site access. Record the equipment's actual ratings and components from existing records. Any isolation, boundaries and removal must be handled by appropriately qualified personnel under the site's procedures. For this lot of unit substations, note whether related devices or spares are included and where each piece is located. Any documentation should describe the actual equipment offered, not merely the wider facility.
Condition and completeness
Disclose missing sections, damaged enclosures, visible corrosion and known storage or environmental concerns. If a transformer is part of the lot, identify its type or any known fluid information from existing documentation rather than opening it. Specialized handling or environmental review may be necessary depending on what is actually present.
Access and collection planning
Transformer and switchgear sections may have very different weights and lifting requirements. Give section dimensions and any documented weights, the floor level and available access to the loading point. Qualified parties should determine separation, lifting and any environmental requirements for the specific assembly before a move.
Identify the building, equipment room, floor level and the practical route to a truck-accessible staging area. For occupied or shared premises, establish who controls the loading area, who can authorize release and whether an appointment is required. Explain any gate, weather, surface or security limitations that are known at the proposed collection date.
We handle removal and transport
A purchased lot can involve more than freight: equipment must be safely isolated, disconnected, rigged, loaded and hauled from its actual location. We arrange and cover those activities, including crane work when needed and all freight. Our qualified crews coordinate the work with the authorized site contact and follow applicable site procedures; you do not need to disconnect, rig, load or haul the equipment yourself. Describe any stairs, tight turns, floor limits, overhead obstructions and available staging so the crew can plan. Never improvise a lift or move energized gear. The method depends on the equipment and site, and collection timing is arranged after the details are known.
Use ratings exactly as recorded
Equipment labels can include several numbers that sound similar but answer different questions: the nominal system voltage, rated voltage, main bus current, breaker frame or trip rating, and interrupting capability. A catalog number is not automatically a rating. Copy the units and surrounding label text, and identify whether the number belongs to the complete assembly or one device. Existing documents may fill gaps but should be marked as records rather than treated as a fresh inspection. If a plate is missing or unreadable, say so. No seller is asked to energize, test or expose live equipment to resolve an uncertain value.
Separate current rating from device details
The current rating on a main bus, the frame size of a circuit breaker and a breaker's trip rating are not necessarily the same. Voltage, phase, frequency, interrupting rating and configuration can matter too. Copy each rating with its label and unit when the information is already available, rather than reducing an entire assembly to one number. If devices have been replaced or the documentation conflicts with the visible label, explain the uncertainty. This is an inventory request, not an instruction to calculate a system rating or set protective devices. A buyer can begin reviewing incomplete information without seller-performed electrical testing.
Electrical safety comes first
Protecting people and active systems comes first. Only appropriately qualified personnel should isolate electrical equipment and determine when it is safe to access, disconnect and release under the site's procedures. A lineup may have more than one source or stored energy, so do not assume a shutdown label or an open door establishes safety. Do not open energized equipment or manipulate protective devices for our review. We do not ask the seller to test or energize anything; send information already available from a safe location instead.
Cash offer, upfront payment and full-service removal
To request a cash offer for unit substations, share the location, the quantity, the information available from existing records or safely accessible labels, and any known damage or missing parts. Include photographs only when they can be taken safely and are permitted by the site. Tell us when the equipment may be released and whether the lot includes related devices or documentation. If something is unknown, say so; no seller-performed electrical testing is needed.
We review the details and discuss an offer when the equipment and transaction are a fit. If an offer is agreed, we pay the agreed amount upfront before pickup. We arrange and cover qualified isolation and disconnects, crane work when needed, rigging, loading, hauling and all freight for the purchased equipment. The seller does not have to perform or arrange this work. Our crews coordinate access and the safe removal plan with the authorized site contact. There is no promise of a particular offer, acceptance or collection date.