Selling the equipment
Owners with surplus switchboards from campuses in Maine can request a review of the specific equipment released for sale. We buy used equipment across all voltage classes rather than selling it, make cash offers where appropriate, pay the agreed amount upfront before pickup and cover all freight for purchased equipment. No seller testing is required. An offer, price or collection schedule depends on the equipment and transaction.
For equipment we purchase, we handle and cover the entire removal and logistics process: our qualified crews isolate and disconnect it, and we arrange crane work when needed, rigging, loading, hauling and all freight. You do not have to disconnect, test, rig, load or haul the equipment. We coordinate the work with the authorized site contact and follow the site's applicable safety and access procedures.
Identify the switchboards
Record the switchboard's main ampere and voltage ratings, manufacturer, section count and the types and quantities of main and feeder devices. The main bus rating and the ratings of individual breakers are different facts; share both where existing labels make them available.
Switchboards from campuses
A campus may have several buildings, equipment owners and access contacts. List the building and floor for each item and distinguish capital-project surplus from equipment still assigned to a building. Collection planning may need to account for occupied spaces, shared docks, building security and the availability of an authorized facilities representative. For this lot of switchboards, note whether related devices or spares are included and where each piece is located. Any documentation should describe the actual equipment offered, not merely the wider facility.
Condition and completeness
Explain whether the board is complete, whether feeder breakers, metering compartments or covers are missing, and whether it has been exposed to moisture or physical damage. Tell us about modifications or blank spaces without assuming that an unused opening proves what a prior installation contained.
Access and collection planning
Switchboards can be broad lineups with multiple transport sections. Approximate length, height and depth, the location of an exterior door, and any steps or tight turns are useful. If the board has already been disassembled, identify which parts go with which section and how they are currently supported.
Identify the building, equipment room, floor level and the practical route to a truck-accessible staging area. For occupied or shared premises, establish who controls the loading area, who can authorize release and whether an appointment is required. Explain any gate, weather, surface or security limitations that are known at the proposed collection date.
Use existing drawings without treating them as a guarantee
A one-line diagram can show the relationship between a main device, feeders, ties and multiple sources, while an equipment schedule can help identify ratings and section counts. If those documents already exist, share the relevant pages and mention their revision date or any known changes. A drawing may describe an earlier installation rather than the equipment as it stands today. It is helpful to identify removed sections, later additions and components that belong to someone else. Do not create a new drawing by opening gear or tracing energized circuits; a qualified site representative can decide what existing information is safe and appropriate to provide.
Use ratings exactly as recorded
Equipment labels can include several numbers that sound similar but answer different questions: the nominal system voltage, rated voltage, main bus current, breaker frame or trip rating, and interrupting capability. A catalog number is not automatically a rating. Copy the units and surrounding label text, and identify whether the number belongs to the complete assembly or one device. Existing documents may fill gaps but should be marked as records rather than treated as a fresh inspection. If a plate is missing or unreadable, say so. No seller is asked to energize, test or expose live equipment to resolve an uncertain value.
Photograph only what can be seen safely
Useful photographs can include the overall exterior, an accessible nameplate, any visible damage and the surrounding route to the loading area. Take them only from a safe, permitted position and follow the site's rules for photography. Never open an energized enclosure, remove a barrier, manipulate a device or approach exposed electrical parts to obtain a better image. If a label is not safely accessible, provide an existing record or mark the detail unknown. Several focused images are generally more informative than a distant picture of a whole room, but photographs are a starting point, not a request for electrical inspection or testing by the seller.
Electrical safety comes first
A closed facility or idle machine does not by itself prove an electrical assembly is safe to handle. Our qualified crews coordinate with the authorized site team to isolate all applicable sources and establish a safe condition before disconnecting or moving equipment. Never operate a switch, remove a cover or expose live parts for a photograph or quote. Seller testing is not required, including operational, insulation or transfer testing. Existing nameplates and project records are useful where safely available, and an unknown rating can simply be listed as unknown.
Cash offer, upfront payment and full-service removal
To request a cash offer for switchboards, share the location, the quantity, the information available from existing records or safely accessible labels, and any known damage or missing parts. Include photographs only when they can be taken safely and are permitted by the site. Tell us when the equipment may be released and whether the lot includes related devices or documentation. If something is unknown, say so; no seller-performed electrical testing is needed.
We review the details and discuss an offer when the equipment and transaction are a fit. If an offer is agreed, we pay the agreed amount upfront before pickup. We arrange and cover qualified isolation and disconnects, crane work when needed, rigging, loading, hauling and all freight for the purchased equipment. The seller does not have to perform or arrange this work. Our crews coordinate access and the safe removal plan with the authorized site contact. There is no promise of a particular offer, acceptance or collection date.