Selling the equipment
If you have surplus switchgear in Maine, start with the equipment you can identify and the location where it is held. We are a buyer, not a seller: we review available details and can make a cash offer for a defined lot. We buy equipment across all voltage classes, pay the agreed amount upfront before pickup, and cover all freight for the purchased equipment. Offers depend on the specific equipment, condition, scope and other transaction details; an inquiry does not guarantee a purchase or a particular price.
For equipment we purchase, we handle and cover the entire removal and logistics process: our qualified crews isolate and disconnect it, and we arrange crane work when needed, rigging, loading, hauling and all freight. You do not have to disconnect, test, rig, load or haul the equipment. We coordinate the work with the authorized site contact and follow the site's applicable safety and access procedures.
Identify the switchgear
Describe the complete lineup, its manufacturer, model or family where legible, number of vertical sections, main and feeder devices, and whether breakers are drawout or fixed. A one-line drawing, if already available, helps distinguish a main-tie-main arrangement from a single-ended lineup without requiring anyone to operate it.
What the 400-amp rating describes
For 400-amp equipment, state exactly where the 400-amp marking appears: on the main bus, a main breaker, a breaker frame or another component. At this rating, a breaker or a smaller distribution assembly may be offered on its own or in a group; identify each separately. Record the voltage, manufacturer, catalog identification and any documented interrupting rating separately. Do not add branch-breaker ratings to infer a main rating or change device settings to check it. If a label is inaccessible, use existing records or leave the figure unconfirmed.
Condition and completeness
Note missing doors, breakers, covers, interlocks or control-power components, and describe corrosion, water exposure or visible damage. An intact exterior does not prove internal condition, so distinguish what you know from what cannot be seen safely. Include spare breakers and documentation only if they belong to the offered lot.
Access and collection planning
A switchgear lineup may consist of several heavy shipping sections rather than one cabinet. Give overall dimensions, the number of sections and any available weights, along with door openings, floor level and the distance to a suitable staging area. The separation and lifting method must be decided by qualified parties for the actual equipment.
Identify the building, equipment room, floor level and the practical route to a truck-accessible staging area. For occupied or shared premises, establish who controls the loading area, who can authorize release and whether an appointment is required. Explain any gate, weather, surface or security limitations that are known at the proposed collection date.
Account for other work at the site
A surplus sale can happen alongside construction, decommissioning or continued operations. Let the buyer know if another contractor controls the work area, if routes may be blocked, or if a building remains occupied. Explain whether the equipment is staged independently or must wait for a separate release decision. A useful plan includes a site contact, a workable access window and an agreed location for the carrier; it does not assume that every project task is complete. Any necessary separation from live systems is a task for qualified personnel, and the seller is not asked to operate or test electrical equipment for a quote.
We handle removal and transport
A purchased lot can involve more than freight: equipment must be safely isolated, disconnected, rigged, loaded and hauled from its actual location. We arrange and cover those activities, including crane work when needed and all freight. Our qualified crews coordinate the work with the authorized site contact and follow applicable site procedures; you do not need to disconnect, rig, load or haul the equipment yourself. Describe any stairs, tight turns, floor limits, overhead obstructions and available staging so the crew can plan. Never improvise a lift or move energized gear. The method depends on the equipment and site, and collection timing is arranged after the details are known.
Use existing drawings without treating them as a guarantee
A one-line diagram can show the relationship between a main device, feeders, ties and multiple sources, while an equipment schedule can help identify ratings and section counts. If those documents already exist, share the relevant pages and mention their revision date or any known changes. A drawing may describe an earlier installation rather than the equipment as it stands today. It is helpful to identify removed sections, later additions and components that belong to someone else. Do not create a new drawing by opening gear or tracing energized circuits; a qualified site representative can decide what existing information is safe and appropriate to provide.
Electrical safety comes first
Electrical equipment can retain dangerous energy or remain connected to more than one source even when a project is described as shut down. Qualified personnel must isolate the equipment and establish its safe condition under the site's procedures before access, disconnection or removal. Do not open energized enclosures, remove barriers, rack breakers or touch exposed conductors to gather information. We do not ask sellers to energize or test equipment. Use existing records and photographs taken only where safely accessible; if a detail cannot be obtained safely, tell us it is unknown.
Cash offer, upfront payment and full-service removal
To request a cash offer for switchgear, share the location, the quantity, the information available from existing records or safely accessible labels, and any known damage or missing parts. Include photographs only when they can be taken safely and are permitted by the site. Tell us when the equipment may be released and whether the lot includes related devices or documentation. If something is unknown, say so; no seller-performed electrical testing is needed.
We review the details and discuss an offer when the equipment and transaction are a fit. If an offer is agreed, we pay the agreed amount upfront before pickup. We arrange and cover qualified isolation and disconnects, crane work when needed, rigging, loading, hauling and all freight for the purchased equipment. The seller does not have to perform or arrange this work. Our crews coordinate access and the safe removal plan with the authorized site contact. There is no promise of a particular offer, acceptance or collection date.