Selling the equipment
If your lot of switchboards in Maine contains Westinghouse-marked equipment or components, identify the pieces and tell us where the marking appears. We are a buyer, not a seller; we evaluate the actual lot across all voltage classes and can make a cash offer when it is a fit. We pay the agreed amount upfront before pickup and cover all freight for purchased equipment. No seller testing is required, and purchase and pricing are not guaranteed.
For equipment we purchase, we handle and cover the entire removal and logistics process: our qualified crews isolate and disconnect it, and we arrange crane work when needed, rigging, loading, hauling and all freight. You do not have to disconnect, test, rig, load or haul the equipment. We coordinate the work with the authorized site contact and follow the site's applicable safety and access procedures.
Identify the switchboards
Record the switchboard's main ampere and voltage ratings, manufacturer, section count and the types and quantities of main and feeder devices. The main bus rating and the ratings of individual breakers are different facts; share both where existing labels make them available.
Reading Westinghouse labels in a lot of switchboards
Westinghouse markings on older electrical equipment are worth documenting exactly as shown. Record whether the name is on the lineup, breaker or other component, and identify any later changes without assuming all parts are original. For this inquiry about switchboards, list the quantities, ratings, related components and missing parts as they are actually documented. An assembly may contain components from multiple manufacturers; the name on one part should not be assigned to the entire lot without evidence.
Condition and completeness
Explain whether the board is complete, whether feeder breakers, metering compartments or covers are missing, and whether it has been exposed to moisture or physical damage. Tell us about modifications or blank spaces without assuming that an unused opening proves what a prior installation contained.
Access and collection planning
Switchboards can be broad lineups with multiple transport sections. Approximate length, height and depth, the location of an exterior door, and any steps or tight turns are useful. If the board has already been disassembled, identify which parts go with which section and how they are currently supported.
Identify the building, equipment room, floor level and the practical route to a truck-accessible staging area. For occupied or shared premises, establish who controls the loading area, who can authorize release and whether an appointment is required. Explain any gate, weather, surface or security limitations that are known at the proposed collection date.
Consider records and known environmental issues
Provide existing manuals, drawings or maintenance summaries if they are available and appropriate to share, but do not create new records by opening electrical compartments. Where a lot includes associated equipment with a known fluid, suspect material, contamination or past spill, disclose what is known and identify any relevant existing documentation. Equipment type and site history differ, so the responsible owner and qualified specialists should determine whether any environmental assessment or special handling is needed. Do not assume that an age or brand establishes the presence or absence of a regulated material. Unknown information can be identified as unknown.
Describe a realistic release date
A demolition date, a planned shutdown and the date an asset becomes available for collection are different milestones. Tell the buyer whether the equipment is already out of service, remains connected, or is subject to a future project decision. If another contractor controls building access or removal, identify that dependency. Propose an availability window rather than promising a date the site cannot yet authorize. The buyer can discuss the lot while plans are developing, but our qualified crews coordinate safe isolation with the authorized site personnel, who confirm final release. No particular offer, pickup date or project outcome should be assumed.
Build an inventory that can be checked
Give each item or lineup section a simple number, then list its manufacturer, description, accessible model or catalog number, voltage, current and quantity. For a mixed lot, say which loose components are included and where they are stored. A spreadsheet, equipment schedule or clear written list is sufficient; exact weights and perfect records are not a condition for starting the discussion. Mark uncertain details as unknown instead of estimating ratings. If several labels contradict the project paperwork, send both sources and identify which one belongs to the physical equipment. A clear inventory makes it easier to distinguish the offered assets from items that must remain on site.
Electrical safety comes first
Before any electrical gear is disconnected, moved or closely accessed, qualified personnel must isolate it and establish its safe condition using the site's applicable procedures. Equipment adjacent to the lot can remain energized, and a building closure is not proof of isolation. Do not remove covers, expose conductors, operate switches or withdraw breakers to collect details. We do not require the seller to perform testing. If the nameplate or condition cannot be viewed safely, use existing documentation or identify that information as unavailable.
Cash offer, upfront payment and full-service removal
To request a cash offer for switchboards, share the location, the quantity, the information available from existing records or safely accessible labels, and any known damage or missing parts. Include photographs only when they can be taken safely and are permitted by the site. Tell us when the equipment may be released and whether the lot includes related devices or documentation. If something is unknown, say so; no seller-performed electrical testing is needed.
We review the details and discuss an offer when the equipment and transaction are a fit. If an offer is agreed, we pay the agreed amount upfront before pickup. We arrange and cover qualified isolation and disconnects, crane work when needed, rigging, loading, hauling and all freight for the purchased equipment. The seller does not have to perform or arrange this work. Our crews coordinate access and the safe removal plan with the authorized site contact. There is no promise of a particular offer, acceptance or collection date.